摘要: 胜利作业六号平台为自升式海洋修井平台,需要热源系统进行加热、保温。进行热源系统的工质比选,引入蒸汽系统作为热源系统。分析蒸汽系统主要组成部分,并分别对锅炉、锅炉水处理系统、蒸汽减压系统、疏水阀组、冷凝水系统等进行了详细计算、分析及说明,完成了设计工作。

关键词: 自升式, 修井平台, 热源系统, 蒸汽系统, jack-up, workover platform, heat source system, steam system

Abstract: The 6th operation platform f shengli oilfield is designed as a jack-up workover platform and it needs heat source system for heating and heat preservation.The paper compared parameters of different heating mediums and finally chose the steam system as the heat source system. Then analysis the main component of the steam system, and made calculations, analysis and descriptions of the boiler, water treatment system, depressurization system, steam trap set and condensate system to finish the design of the heat source system.